Post-Build

The 6″ Little Samson Traction Engine Has Been Built And Steamed – Now What?

Following completion of the build of the traction engine in it’s basic form and taken it out on the road many times running under it’s own steam, there are many more post-build activities and projects ongoing.

The biggest project is undoubtedly the conversion to a Showman’s Engine, complete with dymano and canopy. Go to the Showmans Conversion page to learn about that little (!?) adventure.

List Of Post-Build Follow-On Projects For The Little Samson Traction Engine

This list of projects to undertake following the completion of the basic 6″ Little Samson Traction Engine are either complete in progess now, or planned. Click the link in the Comments column for more information.

Post-Build Projects Status

Snag Items Before Next Steam Run

Comments

Safety Valve – Decrease settings -< 120psi Need to be in steam.
New Regulator Rod Locking Mechanism. Done but screws came loose. Add ratchet washers. Re-test
Re-instate cylinder valve drain cock levers Done. To add drain pipes.
Tighten all fasteners using Loctite (especially spectacle plates/feed pump) LHS done. 6 1/4″ BSF threaded rivets on RHS to do. Need to remove gears, hence back wheel also. NOTE: At the same time investigate RHS crank bearing.
Replace missing wick in RHS crank oiler To oder from LSM
Re-fit feed pump Done but not proven to work yet. To test.
Clean hand pump valve – add quick release lever
Re-fit valve chest cover Done.

Maintenance Items

Clean brightwork De-rust Ongoing.
Repaint Ongoing. Boiler cladding needs repainting.
Water treatment Ongoing.
Brush out Boiler Tubes

Investigation Items

Boiler – internal inspection
Check original slide valve design. Model using Linkage program.
Buy Dynamometer/Indicator instrument Need trailer for load testing. (Small loads maybe via dynamo?)
Driving/Crank  Speeds Investigate permanent tachometer – see typical lathe spindle speed indicators.
Water/Coal Consumption
Check Injector working Important to reduce feed pump vibrations. See Showmans

Showmans Conversion

Dynamo

Test charging car batteries
Add electrical box
Make realistic commutator end cover
Paint crimson

Dynamics/Vibration

Add rubber tyres to wheels Latest – Making Rubber Block Tyres
For steaming make sure injector is used instead of feed pump Clean injector
Make movie with/without balance weigt.
Re-fit flywheel disk.
Add raised section to flywheel disk

Canopy

Finalise design & make CAD drag Done.
Get local professional carpentry shop to make canopy Done – see report.
Finalise & fabricate all stanchions & bracketry. Height depends on rubber block strakes being finalised.

Source square brass tube.

Paint all stanchions & bracketry including existing.

Electrics

New Cabling/Metering Board
Add meters, fuses
Change to brass fasteners
Change alternator cable to 6mm2
Add ammeter & voltmeter points
Buy ammeters – voltmeters
Ammeter email query to 2 Mikes

Others

Make & fit Pickering Governor. Start with CAD drawings. (Have outline from Gilbert book)

Enhancements

Trailer (behind engine)
Trailer (Behind car)
New crank bearings LHS has vertical lift of x? thou. (See report)

RHS to be inestigated. (When doing fasteners change)

 

Lubricator roller clutch
Nameplates
New Regulator Valve Block
Painting & Lining See Idea-for-Colour-Scheme-Painting.png
Steam Organ Unlikely

Leave a Reply

Your email address will not be published. Required fields are marked *